Singapore Mass Rapid Transit

Construction of lots C926 and C927 of the Singapore subway

Client: CMC Ravenna
Year: 2012

Construction of lots C926 and C927 of the Singapore underground railway line.
The total length of the lots is 4,2 km including two twin-tube tunnels and two underground stations. Tunnels have been excavated using six EPB-TBM (Earth Pressure Balance Tunnel Boring Machines).